Roadmap
From console to pilot
Prove one reliable end-to-end coding workflow first, then widen it. Here's what's built and what's next.
MVP milestones
- UI
Web console
Done- ✓Task composer, task log, timeline
- ✓Approval gate, budgets, diff viewer, artifacts
- ✓Workspaces, models, tools registries
- ✓Docs, guide, about, security, roadmap and FAQ
- ✓Five interface languages, motion and page transitions
deliverable · Full console UI on a mock runtime.
- Sprint 1
Foundation & inference
In progress- ✓FastAPI control plane, task schema, state machine
- ✓Model adapter (OpenAI-compatible) for vLLM / SGLang / Ollama
- ✓Dev auth stub with workspace authorization
- ✓Console API mode: live SSE timeline, approvals, cancel, resume
- ○Docker Compose with Postgres
- ○Latency / memory benchmark on a GPU host
deliverable · Chat backend connected to the local model.
- Sprint 2
Agent runtime & repository tools
In progress- ✓Planner with schema-validated plan and bounded repair
- ✓Read-only repo.tree / code.search / file.read with traversal protection
- ✓Persisted steps and tool results; resume from persisted state
- ✓Supervised plan approval bound to the exact plan
- ○Measure tool-call and plan validity on a real Qwen model
deliverable · Agent can inspect a repository and produce a validated plan.
- Sprint 3
Coding execution
Planned- ○Isolated workspace and patch application
- ○Test / lint execution
- ○Bounded retry and replanning
deliverable · Agent can produce and validate a patch.
- Sprint 4
Security & recovery
Planned- ○Policy engine and approval records
- ○Sandbox hardening and audit logs
- ○Isolation and prompt-injection tests
deliverable · Controlled execution with observable safety behaviour.
- Sprint 5
Benchmark & pilot
Planned- ○Repeatable coding evaluation set
- ○Success-rate, latency and resource measurements
- ○Limited developer pilot
deliverable · MVP with documented evaluation results.
After the MVP
P1
- · Semantic repository indexing
- · IDE integration
- · Multiple model profiles and routing
- · Specialist agents (when benchmarks justify it)
- · Scheduled tasks and team workspaces
P2
- · Visual workflow builder
- · Integrations beyond developer tooling
- · Enterprise governance and analytics
The 10-week MVP timeline is a planning estimate; actual duration depends on hardware, scope and security requirements.